Projects

UPRENT is a reliable partner in various pumping projects. Or experience, knowledge and wide range of high quality equipment allows us to complete complex pumping projects effectively. Having assessed details of each particular project, we recommend the most effective pumping solution, deliver the equipment to the site, install the pumping systems and ensure technical maintenance.

Bypass pompownia ścieków Kórnik

BYPASS PUMPING STATION KÓRNIK

Kórnik, Poland

The contractor for the renovation of the sewage pumping station in Kórnik needed to ensure continuous sewage pumping from the city to the treatment plant during the project implementation.

BYPASS OCZYSZCZALNIA ŚCIEKÓW ZIELONA GORA

BYPASS SEWAGE TREATMENT PLANT ZIELONA GÓRA

Zielona Góra, Poland

The renovation of the sewage treatment plant in the Lubuskie Voivodeship took place in 2017, when Uprent took over responsibility for temporary pumping of sewage.

BYPASS POMPOWNIA ŚCIEKÓW KOŁO

BYPASS PUMPING STATION KOŁO

Koło, Poland

The renovation of the sewage pumping station in the Wielkopolskie voivodship took place in 2017, when Uprent took over responsibility for the temporary pumping of sewage. The task was to bypass the existing pumping station for the time of its renovation, to build a replacement sewage pumping system and to connect to the existing installation. Waste water pumping took place over a distance of about 1 km.

SYSTEMY ODWADNIANIA

SEWAGE BYPASS IN RIGA

Riga, Latvia

OSTAS CELTNIEKS SIA won the tender for the construction of infrastructure for the construction of the multifunctional NEW HANZA CITY park in Riga, Latvia.

PRACE NA ZATOPIONYM PROMIE

FERRY RESCUE WORKS

Tallinn, Estonia

During rescue works client’s most important criteria is the response time. In this case – to perform rescue works of a submerged ferry in order to promptly prevent it from total sinking. Taking into account tense situation and time limits, UPRENT offered the client solutions that have been used in analogical situations for the purpose of time saving by minimizing the debate process, project development and choosing of the right equipment as much as possible.

TYMCZASOWE ZASILANIE ELEKTRYCZNE PODCZAS FESTIWALU ŚWIATŁA “STARO RIGA 2016”

TEMPORARY POWER SOLUTIONS AT “STARO RĪGA 2016” LIGHT FESTIVAL

Riga, Latvia

The Council of Riga City organizes a magnificent and extensive lights and sound festival “Staro Riga”, in cooperation with partners GACO SIA and NA SIA. Audiovisual installations, projections and 3D visualizations on walls of the buildings and other urban elements are set up in various places in Riga during the festival week. Taking into account the short time of the festival, every post needs to be provided with electricity with a temporary power source – power generator.

POMPOWANIE BIOMASY W BIOGAZOWNI

Pumping biomass at biogas production plant

Vidzeme, Latvija

Biomass pumping is common in farms and bio-gas stations where the biomass is too liquid to be collected with tractors and other machinery or too solid to be transferred by the simple centrifugal pumps available in households. In this case the client turned to UPRENT when the previous methods were not enough for solving the situation.

TYMCZASOWE ROZWIĄZANIA ZASILANIA NA FESTIWALU MUZYCZNYM KUBANA

Temporary power solutions at „Kubana” music festival

Riga, Latvia

On the island of the biggest river, which crosses the whole country, in Riga city center a music festival “KUBANA” takes place. Many artists perform on different stages for various days during the event and entertain the audience in different ways. The role of UPRENT in the festival – to ensure stages, entertainment spots and the whole territory of the event with electricity.

CZYSZCZENIE HYDROTERMALNYCH ZBIORNIKA Z OBRÓBKĄ DREWNA

Cleaning of hydrothermal timber treatment

Rīga, Latvija

Every year the biggest producer of timber plywood, Latvijas Finieris, organizes technological break during the low season. Scheduled maintenance procedures, preventive repairs and cleaning of various tanks and storages takes place at low production volume. UPRENT was offered to join at the cleaning of pre-treatment soaking basin for logs.

POGŁĘBIANIE W RYDZE

Dredging in Riga

Rīga, Latvija

CASE Usually clients choose to use dredging services for underwater mineral extraction. In this case, along with the client’s need…

BIOLOGICZNA OCZYSZCZALNIA ŚCIEKÓW

Reconstruction of waste water treatment plant Bolderaja

Rīga, Latvija

The reconstruction of the Baltic States biggest city’s waste water treatment plant took place in the year 2011 when general contractor VELVE SIA won the tender of the municipal company Rīgas Ūdens SIA. During the reconstruction works it was necessary to stop all processes in the longest treatment plant sections periodically and sequentially, thus preventing the bypass of the sewerage of the whole city between the technological basins.