
We know you are looking for something.
Allow us to help you.
Apply for phone call or request our specialists visit to your project.
By pressing SEND you agree to our Privacy Policy
UPRENT is a reliable partner in various pumping projects. Or experience, knowledge and wide range of high quality equipment allows us to complete complex pumping projects effectively. Having assessed details of each particular project, we recommend the most effective pumping solution, deliver the equipment to the site, install the pumping systems and ensure technical maintenance.
GAZ-SYSTEM has concluded an agreement for the execution of construction works related to the second part of the northern section of the Poland-Lithuania gas interconnector. The contract for construction works on the Konopki – Kuków section (approx. 77 km) was signed with a consortium of companies led by NDI Energy Sp. z.o.o. UPRENT has provided comprehensive dewatering services to facilities in the Ełk and Grajewo districts.
Polaqua won the tender for the design and construction of the expressway S-61 Ostrów Mazowiecka – Szczuczyn Section: junction “Śniadowo” – junction “Łomża Południe” (without junction) . The length of the route 17 km, UPRENT provided comprehensive dewatering services for the facilities, including transports, execution of installations, 24/7 monitoring, refuelling and servicing of equipment and technical consultations.
A system of temporary sewage pumping, full scope dewatering of the trench and shorings to secure the excavation for the replacement of the sewage collector on the tram route in Poznań for Strabag. For the above task, UPRENT provided delivery of equipment along with comprehensive pump installation.
Dewatering of the excavation for the construction of an underground crossing along the route of the modernized railway line No. 7, on the Otwock – Pilawa for the customer – Budimex. For the above task, UPRENT provided the delivery of equipment for dewatering of excavations along with the installation jobs and supervision.
During the preparations for the extraction of shale gas in Podkarpacie, our client needed high-performance pumps to perform the fracturing process. Clean water had to be delivered from the artificial reservoir in precisely defined stages over a distance of 500 m with a height difference of over 7 m. Before starting the pressing process, the water was to be effectively mixed by pumps with the acid chemistry in a closed mode.
Aldesa won the tender for the construction of the S19 expressway Lublin – Rzeszów, section Lublin – the end of the Kraśnik circuit, including: Part No. 1: section implementation Lublin (Konopnica junction, currently Lublin Węglin junction – no junction) – Niedrzwica junction D. currently Niedrzwica Duże junction with a junction, approx. 12 km long.
Due to the shutdown of the “Saska Kępa I” pumping station for the time of its modernization, it was necessary to design and install a temporary sewage pumping station, which will be responsible for pumping excess sewage in the event of a storm.
During the works related to the modernization of the pumping station “Włochy Mikowa” in Warsaw, the General Contractor had to provide professional solution for a temporary sewage pumping station in the main pumping station
Oferta UPRENT zawierająca konsultację, dobór, instalację oraz elektroniczny monitoring pracy pomp głębinowych, została wybrana przez Konsorcjum budujące spektakularny obiekt sportowy, jako oferta najkorzystniejsza i przede wszystkim oferta kompleksowa, wychodząca naprzeciw skomplikowanym wymaganiom technicznym projektu.
Temporary diversion of sewage from the DN400 channel for the time of construction of the end pumping station in the Warsaw Ringroad construction investment along the S2 road.
As part of the task Reconstruction of the tram line on ul. Budzysza, Stryjewski and Nowotna in Gdańsk. UPRENT Sp. z o.o. in the period from 10/04/2019 to 24/10/2019, performed for Aldesa Construcctiones Polska a service consisting in comprehensive execution of a bypass for the time of construction of a new reinforced concrete culvert along with river bed reinforcements. Additionally, we provided comprehensive dewatering service throughout the entire construction period.
Budimex has won the tender for the construction of two sections of Aleja Niepodległości – Białystok Beltway. The length of the route is 10.5 km, 11 two-level intersections, a tunnel under the tracks. UPRENT provided comprehensive dewatering services, including transport, installation, 24/7 monitoring, refueling and servicing of equipment as well as technical consultations.
As part of the investment task ‘Renovation of the sanitary sewer network with chambers in the area of Gajowa and Jarzębinowa streets in Białystok’, UPRENT in July 2018 provided Terkan with a service consisting in comprehensive construction and maintenance of by-pass for the duration of renovation works.
On the construction of the Niepodległości route in Białystok, client needed a temporary and effective solution for pumping sewage during the construction of new sewage pipeline.
Our client “Aldesa Nowa Energia” Sp. z o.o. won the tender for the construction in record time of one of the largest high-voltage power line projects in Poland, which required specialist assistance at the initial stage of construction.